Theory

$row.name

Professional Proactive Project Platform (PPPP)


PPPP is a platform and mathematical model with a logical structure, which explains the process of Project Management, maintained by Project Manager (PM) in RE/IT/Agriculture/Consultancy/SME. It is for already operating real estate brokers and for new comers in this field, who recognize the real estate sector like their field of realization. By following the steps, provided by Daniel Dobrev, we shall learn how to improve our skills, doesn’t matter work for us or for somebody else.
This new element which depicts us as a PM is a P.
Uniqueness of PPPP:

  • Includes all the phases of the project management from the very beginning till the end. No missing points, because if one important detail is missing, the P. cannot be realized smoothly and in the time frames in scope of financial framework;
  • Emphasizes is done on preparation validation of the P., long before make a Business plan, which many scholarships think is the 0 phase of the P.;
  • Every PM can based on his experience to add and develop PPPP, Thus it becomes more vivid and place/time specified.

In this video we will only point out the basic elements and crucial points of PPPP. Details will be given separately in next courses.
This is a general layer for RE sector. Second layer is a small group discussions on special type of RE projects or in special region. Third layer is an individual case approach (coaching).
Basic elements of general PPPP:

  1. Definitions.
  2. Preparatory phase.
  3. Executing phase and finalization of the P.

What is Project? How to come on idea for the project, starting from ideas and common things in our everyday life.
Why to "projectize" our lives, and why projects give a content of our existing… Philosophy? No, not at all. This is the reality. And not a virtual one. The Project makes Project manager. And our aim is to become a successful PM.
In front of PM in RE:

  • How many Ps can a person realize in one’s life?
  • Previous Ps. – yes or no?
  • Competition of projects?
  • Size/Scope of the P.?
  • Are we ashamed/ afraid of a P.?

We explain the figures of Project Supporter (a Person/ People selected by the PM to support the implementation of the P. in each of its phases and as a whole) and Investor. Explain the differences between them and their separate role in project management. Especially this difference make sense in RE projects. Downstairs we will concentrate exactly in communication with PS.
PS is different from: - Influencers; - Agitators; - Inspirators; - Intermediaries;
By using PS u optimize the P.
The originality of PPPP is an implementation of the figure of Difference of Levels (together with Dynamic and Static part of the P. that we will analyze later). This is a unique characteristic which defer your Project from others. There is a mathematical formula for calculating DoL, but most important are practical hints how to define it.
DoL is a Difference between the level of the business when the P. is realized and the level before P. was realized.
DoL is missing point as a product or service in the specified place/ country and to apply it as a project implementation in the selected location for the realization of the P. by the PM with the highest added value at the most appropriate time.
Give an answer of the questions that other project management theories do not:

  • Where to realize the P.;
  • When exactly to realize it;
  • How – by the new company, or by using already existing entity (career development).

4 elements of DoL analysis

  • Overall innovation;
  • The DoL must be realized and made meaningful through analysis of some historical and current needs over time as well as of some successful models which have been implemented. The so-called time range.
  • The DoL should be analyzed taking into consideration related aspects such as the territory /geography/ region.
  • The DoL should be considered in national and psychological plan.

DoL is an important element of project management, which evaluates the P. before any formal calculations and documents (such risk analyses, business plans etc.).
After explaining the main definitions and focal points of PPPP is coming the time to explain 3 phases of the Project. They are:

  1. Preparation phase;
  2. Execution phase;
  3. Final phase.

Preparation phase starts with PASSPORT OF THE P., which includes: - a P. fully understood with its functional characteristics, as indicated above in the definition part: - the highest possible DoL generated; - defined time and place for the realization of the P. This document is for the PM only, to clarify the things he was summarized to this moment and to make a rough plan upfront.
In the preparation phase we will concentrate on Resources. They are 4 types: - financial; - HR; - legal; - others. All of them are important, but of course the top priority is financing. Yes, u are right, without money, no realization. But I will teach u to use the power of other resources as well. I will teach u to choose the most effective financial vehicle, most effective team to work it. This is the key priority of PM. After defining the resources we have to make business plan, which is the end of this phase.
Financial Resources (F). Approaches in RE: - From the most difficult to the easiest as a choice of financial resource. It means that the procedure to use one financial resource might be longer and more complicated, but it worth to try with it instead of fill application forms of advertised sources (to be easy, means costs your money!); - From outside to inside (international resources are generally cheaper); - From the larger value to the smaller one; - Blending of methods (use couple of available resources, mixed by the RE manager); - Compliance with the current situation and its use in favor of the PM (Availing from the economic situation on a global and national scale. Making use of the state of the banking and financial system – liquidity, macro framework, etc. This is done in order to obtain financial conditions by claiming the uniqueness of the project and falling into the target group for priority funding (government/municipality policies or those of the relevant institutions/ banks).
Hints:

  • Creating or using a broad database of financial sources (Fig. 5)
  • Preparing a tree of possibilities (Done by the PM. The result of the tree preparation – one basic financial model at the top and two or three spare ones in the first row. The lower base of the tree remains for the archives and to be used in other project processes)
  • Constructing a final aggregate financial model or matrix. This document will be used for next documents.
  • Available F. in RE
  • Donors and subtype Institutional donors. They are targeting social housing and some connected infrastructure projects with a social (noncommercial value). But by using them, u can input also commercial projects (in noncommercial macro frame)
  • Commercial banks. U know these resource better than me. By using data base and tree approach and comparing the policies u choose the best one. The piece of art for PM in RE is to put them in one pot together with other mechanisms (not to point them as the only available F, as they think are). Banks have to cooperate with RE (the only stable and predictable one), so u have advantage that u re acting in this field. Many banks have NPL or RE departments. Try to impose yourself as the partner of them to accelerate their activities. Or that u gonna bring to them new clients. It will
  • Investment mechanisms. - JV (Joint Venture). Obtaining a percentage of the P. in turn of investment. With the possibility to leave after a certain period or revaluation of the share participation following revaluation of the P. once the set time for exit is reached. JVs can be resorted to at a later stage in the development of the P, and some better terms will be agreed on at that time; - Foreign Direct Investment Funds. The assessment of the participation is done by the fund itself. They can be fund, family, pension, and others. Here, the personal contact of the PM with the head of the fund is extremely important (explained below). They can be of an open (unlimited accumulation of capital in it) or a closed type (announcement of the amount to be raised, and then it is closed for any further individual or institutional investments).
  • New forms: - Creation of the campaign to raise the fund in social networks and media. This is a type of crowd funding, but especially in RE. For this u need a cause – social, cultural and other not directly related to RE); - cooperative funding (RE cluster); - foundation of saving bank or RE fund.

Manpower (M)

  • This is the human resource needed as a project team to fulfill the objectives defined by the project in its various phases. - Complex approach in choosing M. (This means a cluster approach and the initial structuring of sub-teams with the respective leaders. After that, they themselves offer nests of additional employees if needed. However, key specialists are functionally needed); - Outsourcing of M. (The advantage is that there is no risk in the management of resources, but the performance of a result)

Legal resources (L).

  • Regulatory base (what legal form to choose to act, if there some restrictions from legal point of view, to avoid tem initially); - Institutions (related to the RE regulations directly, or indirectly, how they are cooperate each other); - Availability of e-services/ e-government; - Other regulatory resources (Accumulated moral, religious and behavioral forms in the society or in separate social groups, which are key for the realization of the P.)

Other resources (O).

  • Geopolitical (The position and shape of the country in terms of project implementation in the region and the world. Static and dynamic assessment of the situation (over time and with assessment of future development); - Climate changes and migration waves; - Infrastructure (internal, international connectivity, natural resources); - Folk psychology and emotions 9neglected from many PM in RE, but very important of acceptance of new settlers or new RE ideas).

So, we finish with resources, now are coming two final documents in Preparatory Phase:
PROJECT SUMMARY/VISIBILITY STUDY. It includes: - Name of the P. (including a website) with a precise description of the place and time of implementation; - Specification of the resources identified above; - Calculation of return. This last one u have learnt to calculate on a basic formula and (Fig. 6) and I will not make a detail observation here; - Risk analysis; - Relationship between returns and risk analysis (very important element, Risk and return are the foundations on which rational and intelligent investment decisions are made. In a broad sense, we define risk as a measure of the degree of fluctuation or uncertainty of return, and return – as the expected income or cash flow from any investment); - Making a teaser/ video presentation of the P.

BUSINESS PLAN (BP).
D) BUSINESS PLAN (BP).

The preparatory phase ends with the preparation of the BP. Two main elements are evaluated here: - DoL; - budget characteristics (rate of return on investment plus total cash flow taking into account each element).
The BP includes:

  • Legal analysis of the P.;
  • Economic analysis of the P. (justification of the need for realization of the P. at this place and at this time);
  • Analysis of the competitive environment;
  • SWOT analysis, which is a repetition of the above risk analysis, but to a lesser extent and made by other experts independent of the PM (the company engaged in the development of the business plan);
  • final financial analysis (with the elements above), consisting of three scenarios: - optimistic, realistic, and pessimistic. The so-called Cash Flow.

It is best to entrust the development of the Business Plan to a professional agency. How to make this choice: - Local or foreign. It depends on the positioning of the P. and the desire to attract a stable investor (the latter believe established agencies in the top 10 list of audit agencies). The signature on the BP of a recognized person from the respective company means approval of the RoI and IRR. This is a guarantee for the realization of the P.; - General or specialized. The rule is for specialized one to be selected, unless it is a matter of certain Ps. In this case only specialized agencies, defined by the specific field (military, security, research projects) or by a specific certification body/ institute are accepted.
This is the end of Preparatory phase. We will go to the next stage – Execution of the P.
Start the second phase – EXECUTION of the Project.
The running of our project is going smoothly because at the beginning we determined very well DoL and resources… So it has to be easy… But to speed up realization of the Project and to reach its goals I input two new vectors Dynamic and Static elements. What they means: they are communication instruments which help to PM to move faster and more effective. This part of the lecture is a piece of art (doesn’t exist to other theories).
We will see the content of D. and S. The balance between them.

DYNAMIC PART (D)

D. is a lever for advancing the P. which unites the dynamic elements of its partial and full realization and achievement of the project goals. D. is most often likened to the human factor, which we involve to support the P. or the PS (from above).
Generally all the P/Ps are realized by people. Support, part, disseminate. Here we are talking not about the staff of the P., but outstanding of it people – supporters or Supporter. Without them P. can be realized, but will be slow, no efficient, formal and no content. This part is an active part of PPPP that every PM has to give his best. Not to stop to communicate with the aim to find suitable/right person/s for our P/Ps.

STATIC PART (S.)

S. is a lever for advancing the P., which unites all static, infrastructural elements, other than the D., for the partial and complete project realization. In other words, everything without the human factor. It includes (not exhaustively): financial macro framework; - legal framework; - organizational structure of the supporting environment for project development; - policy framework; - social environment; - changes in all of them.
S. is equal to resources in a preparation phase in a new role. Which are they: Folk psychology in general; Individual elements, present in most citizens; Institutional architecture.
In PPPP I will teach u how to use D, and S, to speed up your RE P. To make a balance and to use every single element of them.
Combinations (Fig. 7)
Because this is a human being material we define 8 phases of finding and working with the PS./PSs or D.:

  • Preparatory work before the physical arrival at the place of implementation of the P. and before the time for its start. Phase (-1).
  • Starting work on site. Phase (0);
  • Establishment of contacts (Phase 1). This is the most important synthetic and analytical part of the use of the D., as accumulated data and the ability to manage an array of them. Prioritization of contacts and selection of PS (given as a definition in the introductory part). This activity is done personally by the PM and is not shared with other people on the team and outside. This is solely and exclusively for the use of the PM.

How to do? 1. Professional tree; 2. Family (personal) tree. 3. Fragmentation of the PS approach. 4. Approach and opportunity to develop the contact with the PS. 5. Should we choose one or more PSs? 6. Selection of PS.

  • Contact imitation. (Phase 2);
  • Establishing contact and beginning of the relations with the PS. (Phase 3)
  • Process of primary verification of the success of the establishment of the contact. (Phase 4)
  • Confirmation and development of the relationship of trust with the PS. (Phase 5)
  • Maintaining the contact with the PS. (Phase 6)
  • Dynamic changes in the nature of contact with the PS. (Phase 7). First option: Change of the P. Second option: Change of the PS. Third option: A change of the PM. There may also be a combination of changes with two deviant factors (e.g. changed P. and PM)

For managing the S., u have to observe the changes coming to all 4 recourses in Preparatory phase: - F.; - H; - L.; - O.

PHASES of EXECUTION PHASE:

  • Management of the P.; - Critical moments in the leadership of the P. (Reduction (below the critical minimum) or termination of one of the resources; Incorrect balance between D. and S; Problems in team management and internal communication.);
  • Suspension / termination of the P.
  • Merging / separating a P.
  • The last phase of project management is a FINALIZATION/DISSEMINATION of the results of the P.
  • Completion
  • Control
  • Guarantees.

The final point in this video is the РРРР in IT environment.
This is the topic for other lecture because of the important of RE in virtual world, but we will going through some basement postulates:

  • Attention to the hybrid P. RE plus Virtual elements (advertising, presentation)
  • Usage of AI. How, where.
  • Type of resources available in RE Hybrid P. Specifics.

So this is the end of today’s video lesson on PPPP which gives to u:

  • Basic structure of PM in RE that u have to keep in mind and without ne of them P. will be not vital and successful;
  • By practicing on PPPP u will see that this algorithm works.
  • Next steps are just to go in details in every chapter and to define development in motion.